Haji Missed the first post.
While preaction systems are one way to appease the fears of the anti sprinkler lobby, I have major philosophical problems with the rationale of taking a simple, effective system with an incredibly high success rate and very low failure rate and then making it more complicated and trebling the failure mode probability. (As an aside, UK insurers have largely withdrawn their support for pre-action systems and new systems are becoming rare in Europe as a whole). Why not ask those who are objecting to the presence of sprinklers to justify their decision based on evidence/experience of false alarms/ leaks/system failures ? Point out that major museums, galleries, libraries are national archives are all sprinkler protected. Tell that IBM sprinkler their factories and their own machine rooms. Given the time of year, it makes me wonder if someone is suffering from low blood sugar(pre Iftar) or an hyperactive gall bladder (post Futoor). Eid Mubarak ! Stewart On 4 Sep 2009, at 14:24, Haji, Jaber M wrote: > It is a three floors level area, what are the minimum requirements > to convert such wet system to a double interlock pre-action system? > ________________________________________ > From: [email protected] [sprinklerforum- > [email protected]] On Behalf Of Reed Roisum > [[email protected]] > Sent: Friday, September 04, 2009 3:46 PM > To: '[email protected]' > Subject: RE: Fire Sprinker System Changes in Vis Lab > > Jaber, > > What kind of advisement are you looking for? The plan for > protecting this space with NOVEC 1230 and using VESDA early warning > detection sounds like the way to go. Are you questioning removing > the sprinkler system? You will most likely need AHJ approval to > install only the clean agent system in lieu of sprinklers (although > this isn't IBC world is it?). You might want to advise the owner to > consider having a sprinkler system 'back up'. Sounds like a pre- > action system would be warranted with the level of fear it sounds > like they have. You can also try to dispel some of the unfounded > fears they probably have regarding accidental discharges, but don't > expect them to be ok with a wet system remaining in this space. > There are a number of other considerations to be made...such as > sealing of the room. Does it have a drop ceiling? > We can discuss more once I know what you are after. > > > Reed A. Roisum, CET > Fire Protection > > Ulteig Engineers, Inc. > 3350 38th Avenue S. > Fargo, ND 58104 > 701.280.8580 direct > 701.212.8810 cell > www.ulteig.com > > Energy | Water | Built-Environment > > CONFIDENTIAL COMMUNICATION: Emails from this company normally > contain confidential and privileged material, and are for the sole > use of the intended recipient. Use or distribution by an unintended > recipient is prohibited, and may be a violation of law. If you > believe that you received this in error, please do not read the body > of this e-mail and please inform the sender that you have deleted > the e-mail and any copies. Thank you. > > > -----Original Message----- > From: [email protected] > [mailto:[email protected]] On Behalf Of Haji, > Jaber M > Sent: Friday, September 04, 2009 5:52 AM > To: [email protected] > Subject: Fire Sprinker System Changes in Vis Lab > > Your insights/advised are highly appreciated pertaining to a new > visualization lab in new university protected by automatic sprinkler > system and the vendor of the visualization equipment is worried > about sprinkler leakage. Have a look at his draft letter highlighted > bellow and advise us accordingly. Thanks in advance. > > ------------------------------------------------------------------------------------------------- > > Changes to sprinkler system in Vislab Area of building one. > > The current sprinkler arrangement in the vislab section of building > puts our visualization equipment at significant risk. The water based > system if it goes off could easily ruin millions of dollars of > equipment in a very short period of time. Including all Sony > projectors that drive the CAVE and MPR areas. > > For this reason it is imperative that we make changes in these spaces > to the current fire system. Visualization laboratory a plan for > corrective action has been prepared and is recommended as > the best course of action. > > First the building fire detection system should be extended to the Vis > lab Data Center, Recording Room, DS1, DS2/3, CAVE and MPR Projection > spaces. This will ensure timely notification of any emergency to the > response team. > > Second the current sprinkler system in the above areas should be > closed and drained of water to ensure no accidents can cause loss of > equipment through water damage. Additional Fire Extinguishers should > be placed in these areas as well. > > Third a permanent solution utilizing VESDA detection system and NOVEC > fire suppression system should be installed in all of these areas. > The installation should be carried out > in such a way to minimize laboratory downtime to a maximum of > a single week. We believe this can be done by the careful removal of > the most delicate equipment from the lab space, covering the remainder > in protective plastic and having NOVEC piping installed and configured > after the delicate equipment has been removed. > > A similar adjustment must be made to the two lecture hall projection > rooms containing Sony 4K projectors. > > We believe that these changes would be in the best interest of a > long term protection of its investment in its visualization equipment. > > The contents of this email, including all related responses, files > and attachments transmitted with it (collectively referred to as > "this Email"), are intended solely for the use of the individual/ > entity to whom/which they are addressed, and may contain > confidential and/or legally privileged information. This Email may > not be disclosed or forwarded to anyone else without authorization > from the originator of this Email. If you have received this Email > in error, please notify the sender immediately and delete all copies > from your system. Please note that the views or opinions presented > in this Email are those of the author and may not necessarily > represent those of Saudi Aramco. The recipient should check this > Email and any attachments for the presence of any viruses. Saudi > Aramco accepts no liability for any damage caused by any virus/error > transmitted by this Email. > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > > For Technical Assistance, send an email to: [email protected] > > To Unsubscribe, send an email to:Sprinklerforum- > [email protected] > (Put the word unsubscribe in the subject field) > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > > For Technical Assistance, send an email to: [email protected] > > To Unsubscribe, send an email to:Sprinklerforum- > [email protected] > (Put the word unsubscribe in the subject field) > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > > For Technical Assistance, send an email to: [email protected] > > To Unsubscribe, send an email to:Sprinklerforum- > [email protected] > (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)