Jones Beene wrote:
Part 8 is now up on YouTube to answer the objection that the aluminum pan itself was somehow involved. There is still one wire to the signal generator - no ground, no fakery.

If we're back to a SIGNAL wire running to the SIGNAL GENERATOR, then I guess we can say for sure that the signal generator is necessary. Obviously if a wire to the generator is necessary, then the generator is part of the loop, whether capacitively coupled or directly coupled.

Too bad -- in video #7 Ron seemed to be asserting that no SG was necessary, all that was needed was a ground wire. I guess that was false.

Reply via email to